AIP Year-Wise
Brief:
AIP Date : 2023-04-27
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
1350 HP (Horse power) Engine with associated Automotive | 2023-04-27 | Army | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
2024-09-17 | NA | 2024-10-16 |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col Jai Singh,Lt Col Mohit Goyal | NA | NA | 35094,35094 | NA |
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Army Integrated Deision Support System (AIDSS) | 2023-04-27 | Army | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
2024-10-22 | 1728371305.pdf | 2024-11-27 |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Lt Col Amit Bector | NA | NA | 39551 | NA |
Brief:
A turbine based electric power generator to be used on vessels
AIP Date : 2023-01-16
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
4 MW Gas Turbine Generator | 2023-01-16 | Navy | A turbine based electric power generator to be used on vessels. |
Start Date | Questionnaire Document | End Date |
---|---|---|
2024-10-20 | NA | 2024-11-20 |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Prashant Kumar Rai | NA | NA | 23010335 | NA |
Brief:
It is designed to meet the demand for underwater domain awareness and ordance delivery with its high endurance would be capable of undertaking roles such a Intelligence, Surveillance and Reconnaissance (ISR) and Mine Laying
AIP Date : 2023-01-16
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Extra large Unmanned Underwater Vehicle (XLUUV) | 2023-01-16 | Navy | It is designed to meet the demand for underwater domain awareness and ordance delivery with its high endurance would be capable of undertaking roles such a Intelligence, Surveillance and Reconnaissance (ISR) and Mine Laying. |
Start Date | Questionnaire Document | End Date |
---|---|---|
2023-03-23 | 1730786933.png | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | 1730786933.png | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Akshay Thapliyal | 23010830 | NA | 23010093,9969321701 | dsmaq@navy.gov.in |
Brief:
Shipborne Laser Weapon with its integral equipment is envisaged to be capable of detecting Mini/Micro drones (upto 0
AIP Date : 2023-01-16
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Shipborne Laser Weapon System (30 kw) | 2023-01-16 | Navy | Shipborne Laser Weapon with its integral equipment is envisaged to be capable of detecting Mini/Micro drones (upto 0.01m2 RCS) and engaging Mini/Micro drones / loitering munitions/ small boats using Laser system. Key Specs: Target RCS – 0.01m2; Beam Power Density – 250W/cm2; Radar range – 10 Km; Wt < 8T; 360deg EO/IR sensor coverage with recording; RF Direction finding/ SIGINT and Jamming capability; Response time >10s; System readiness <3min. |
Start Date | Questionnaire Document | End Date |
---|---|---|
2023-05-16 | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Vivek Singh Chhoker | 26771320 | NA | 26771336,9745892807 | dsr@navy.gov.in |
Brief:
Cater to future requirements in accordance with ship induction plan indicated in MCPP, for period 2022-2030
AIP Date : 2023-01-16
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
12 MW Electric Propulsion system for Indian Naval Ships | 2023-01-16 | Navy | Cater to future requirements in accordance with ship induction plan indicated in MCPP, for period 2022-2030. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | 1730787005.png | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | 1730787005.png | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Deepak K | 23011352 | NA | 23010802,8130025847 | dme@navy.gov.in |
Brief:
SRGM is a light weight, rapid-fire naval gun providing unrivalled performances and flexibility in any air defence and anti-surface role, particularly in anti-missile role
AIP Date : 2022-09-16
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
76mm Super Rapid Gun Mount | 2022-09-16 | Navy | SRGM is a light weight, rapid-fire naval gun providing unrivalled performances and flexibility in any air defence and anti-surface role, particularly in anti-missile role. |
Start Date | Questionnaire Document | End Date |
---|---|---|
2023-02-09 | 1730806096.png | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | 1730806096.png | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Rajat Kundu | 26771320 | NA | 26771336,8281379120 | dsr@navy.gov.in |
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
30mm Naval Surface Gun | 2022-07-11 | Navy | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
2022-09-23 | NA | 2022-10-17 |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Pawan Kumar Nayak | 26771320 | NA | 9642718860 | dsr@navy.gov.in |
Brief:
EOIRST provides 360 degree surveillance, tracking through passive sensing
AIP Date : 2022-04-06
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Electro-Optical IR search and Track (EIORST) system | 2022-04-06 | Navy | EOIRST provides 360 degree surveillance, tracking through passive sensing. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Lt Cdr Vivek Kumar Shukla | 26771320 | NA | 26771339,9124910419 | dsr@navy.gov.in |
Brief:
URAN subsonic Anti Ship Missile Fire Control System upgradation of modules and software of central command and control computing device and interface with the missile launchers
AIP Date : 2022-04-06
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
URAN SSM complex Fire Control system | 2022-04-06 | Navy | URAN subsonic Anti Ship Missile Fire Control System upgradation of modules and software of central command and control computing device and interface with the missile launchers. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2023-06-27 | NA | 2023-07-17 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Apar Kapoor | 23011028 | NA | 23793151,9958171910 | dwe-navy@nic.in |
Brief:
This Gun has Enhanced destructive potential, Aability to fire Extended Range Guided Munitions, Hgiher muzzle velocity, Cost effective solution against present/futuristic threats
AIP Date : 2022-06-21
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
127mm Medium Calibre Gun | 2022-06-21 | Navy | This Gun has Enhanced destructive potential, Aability to fire Extended Range Guided Munitions, Hgiher muzzle velocity, Cost effective solution against present/futuristic threats |
Start Date | Questionnaire Document | End Date |
---|---|---|
2022-09-22 | NA | 2022-10-14 |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Rajat Kundu | 26771320 | NA | 26771336,8281379120 | dsr@navy.gov.in |
Brief:
Diesel engines are installed onboard majority of the IN ships for propulsion and power generation
AIP Date : 2022-04-06
SHQ : Navy
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Medium Speed Marine Diesel Engine | 2022-04-06 | Navy | Diesel engines are installed onboard majority of the IN ships for propulsion and power generation |
Start Date | Questionnaire Document | End Date |
---|---|---|
2022-06-14 | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2023-03-16 | NA | 2023-07-21 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Cdr Deepak K | 23011352 | NA | 23010802,8130025847 | dme@navy.gov.in |
Brief:
It is envisaged to develop Mobile Ground based Multipurpose Jammer System for carrying out ESM, DF, COMINT as well as COMJAM & ECM against AWACS/ AEW&C, AI radars of fighter aircraft, V/UHF communication band & maintenance support vehicles
AIP Date : 2022-07-11
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Mobile Ground based Multipurpose Jammer System | 2022-07-11 | AF | It is envisaged to develop Mobile Ground based Multipurpose Jammer System for carrying out ESM, DF, COMINT as well as COMJAM & ECM against AWACS/ AEW&C, AI radars of fighter aircraft, V/UHF communication band & maintenance support vehicles. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr Chetan Gosain | 21115703 | Wg Cdr Ops IEW | 23063727 | Mastergreen.space@gov.in |
Brief:
It is proposed to develop a Multiband Programmable RF Sensor Satellite which is capable of detecting RF sources (0
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Multiband Programmable RF Sensor Satellite | 2022-10-19 | AF | It is proposed to develop a Multiband Programmable RF Sensor Satellite which is capable of detecting RF sources (0.5-40 GHz) from LEO. Critical parameters that are to be measured from the space-based sensor include intercepted parameters comprising of emitter identification along with time of arrival, direction of arrival, frequency range for emitter (minimum and maximum with deviation), all frequency pattern (Fixed, Agile, Batch, Dwell and switch etc.), Pulse Repetition Interval and Pulse Group Repetition Interval (with all PRI pattern like Constant, Jitter, Stagger, Dwell & Switch etc.), PRI associated with each spot frequency Pulse Width, Effective radiated power of emitter along with type of Antenna Scan, Scan Rate, Polarization, Beam width (Elevation and Azimuth), Side Lobe Level (with Standard deviation), Time on Target Wave, localisation Information (in user defined format) along with Intra Pulse data. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Gp Capt DA Kale | 21115590,5996 | Wg Cdr Ops IEW-E1 | 23063727 | Mastergreen.space@gov.in |
Brief:
The last stage of a rocket after separation of spacecraft will be loitering in the outer space for considerable time, before eventually becoming debris
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Innovative Space Applications of Fourth/ Final Stage of Launch Vehicles | 2022-10-19 | AF | The last stage of a rocket after separation of spacecraft will be loitering in the outer space for considerable time, before eventually becoming debris. This stage could be converted into a short-term satellite bus for experimental payloads. Integration of an ELINT or EO payload to the final stage of the launch vehicle is proposed as a challenge. The necessary on-board support elements for controlling and extracting the information from the payload would also need to be developed. The challenge should include the required protection mechanism for the payloads during the rocket operation and its deployment on demand. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr NS Praveen | 21117574 | Wg Cdr Ops Space-II | 23015859 | dspace574@iaf.nic.in |
Brief:
It is envisaged to develop a LEO constellation of two satellites for extending satellite communication services
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
High Throughput Communication Satellite in LEO | 2022-10-19 | AF | It is envisaged to develop a LEO constellation of two satellites for extending satellite communication services. The payload configuration could be 'Ku' or 'Ka or higher bands of microwave spectrum to accommodate high data rate applications. End-to-end solution is envisaged, with ground control systems and hub infrastructure. Multiple SDR based user terminals could be planned depending upon operational utility with data rates better than 100 Mbps. The user terminals could be static, airborne and mobile. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr S Mukherjee | 21125284 | Wg Cdr Ops SATCOM-I | 23017427 | dsigmnt.iaf@.nic.in |
Brief:
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
On Orbit Maintenance and Refueling (OOMR) technology in | 2022-10-19 | AF | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr NS Praveen | 21117574 | Wg Cdr Ops Space-II | 23015859 | dspace574@iaf.nic.in |
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
On Orbit Propellant Storage and Transfer system | 2022-10-19 | AF | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr NS Praveen | 21117574 | Wg Cdr Ops Space-II | 23015859 | dspace574@iaf.nic.in |
Brief:
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
On Orbit Space Infra maintenance and upgrade operations | 2022-10-19 | AF | NA |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr NS Praveen | 21117574 | Wg Cdr Ops Space-II | 23015859 | dspace574@iaf.nic.in |
Brief:
Very Low Earth orbit (VLEO) is usually populated by small satellites that are low cost but carry certain payloads from which useful information can be derived
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Modular, Multi payload Configurable VLEO Vehicle/Bus | 2022-10-19 | AF | Very Low Earth orbit (VLEO) is usually populated by small satellites that are low cost but carry certain payloads from which useful information can be derived. Hence, it is envisaged to build a VLEO satellite bus, which is modular, low cost and easily integratable with multiple payloads, should have efficient propulsion system to effectively perform housekeeping operations and also achieve the mission life. This satellite bus should be able to carry miniaturised payloads, depending on the mission requirements. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr NS Praveen | 21117574 | Wg Cdr Ops Space-II | 23015859 | dspace574@iaf.nic.in |
Brief:
Space based surveillance has the capability for early warning and detection of any CBRN activity on ground
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
CBRN Threat detection and Monitoring Sensors for VLEO B | 2022-10-19 | AF | Space based surveillance has the capability for early warning and detection of any CBRN activity on ground. Space based sensors will act as the primary triggering layer for early detection of these CBRN activities. As a component of challenge 16, it is proposed to develop specific sensors for detection and identification of CBRN (Chemical, Biological, Radiological, and Nuclear) activities and their sources. The sensors should be easily integrated into the VLEO satellite bus. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Gp Capt DB Roy | 21115562 | Wg Cdr OPS (NBC) | 23062783 | Apathy51@nic.in |
Brief:
AEHF satellites provide a network of encrypted, jam-proof communications for strategic for tactical secure communications and it is proposed to develop an AEHF GEO satellite which should capable of handling ten times more data than the existing rate and feature advanced encryption technology
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Advanced Extremely High Frequency (AEHF) GEO Satellite | 2022-10-19 | AF | AEHF satellites provide a network of encrypted, jam-proof communications for strategic for tactical secure communications and it is proposed to develop an AEHF GEO satellite which should capable of handling ten times more data than the existing rate and feature advanced encryption technology. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr S Mukherjee | 21125284 | Wg Cdr Ops SATCOM-I | 23017427 | dsigmnt.iaf@.nic.in |
Brief:
High-altitude pseudo satellites, or HAPS, are unmanned air vehicles (UAVs) that can hold a fixed position
AIP Date : 2022-10-19
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
High Altitude Pseudo Satellite | 2022-10-19 | AF | High-altitude pseudo satellites, or HAPS, are unmanned air vehicles (UAVs) that can hold a fixed position. They could be airplanes, airships or balloons. HAPS operate in the stratosphere, closer to Earth than many satellites but further up than drones and conventional aircraft. They offer persistent surveillance, communications, and specialist missions over area of concern. HAPS is a solar-powered UAV. It relies on solar/ renewable/ green energy solutions and remain in the air for months or years. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Gp Capt Sarang Vashisht | 23177351 | Sec PMT Ops (Off) | 23015104 | Meharbaba.info@gov.in |
Brief:
Missile with a range of 1000 km to attack a fixed or mobile ground-based target with highly accurate guidance systems and can be used effectively against very small targets
AIP Date : 2023-08-01
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Long Range Land Attack Cruise Missile | 2023-08-01 | Army | Missile with a range of 1000 km to attack a fixed or mobile ground-based target with highly accurate guidance systems and can be used effectively against very small targets. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Gp Capt Balamurgan,Wg Cdr B Das | 21117564 | Wg Cdr Wpn (F) | 23060630 | procfive-75@gov.in |
Brief:
It is proposed to develop a modular small satellite bus which is capable of integrating different payloads in short time for LoD purposes
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Modular Small Satellite Bus for rapid integration into | 2022-10-19 | HQIDS | It is proposed to develop a modular small satellite bus which is capable of integrating different payloads in short time for LoD purposes. The satellite bus design has to be modular for easy and quick integration with different payloads and finally with the mobile launcher with overall weight between 150-650 Kgs. The design should consider the option of multiple small satellites, with in the specified overall weight and space, for integration into mobile launcher. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
Small-lift launch vehicle with payload capacity to launching small satellites, with the capability to support multiple orbital drop-offs to low Earth orbit
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Small Satellite Launch Vehicle for launching Satellite | 2022-10-19 | HQIDS | Small-lift launch vehicle with payload capacity to launching small satellites, with the capability to support multiple orbital drop-offs to low Earth orbit |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
it is proposed to develop a RF based (‘V’ band) Inter-Satellite Link module for small satellites in LEO to communicate with other LEO satellites and GEO satellite as part of the TDRS system
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
V-band based Inter-Satellite Link for Small LEO Satelli | 2022-10-19 | HQIDS | it is proposed to develop a RF based (‘V’ band) Inter-Satellite Link module for small satellites in LEO to communicate with other LEO satellites and GEO satellite as part of the TDRS system. The module should be able to easily integrate into LEO satellites. A compatible receiving system has to be integrated into the GEO satellite. The data rate for this system is proposed to be upto 15.Gbps. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
it is proposed to develop a Laser based Optical Inter-Satellite Link payload for small satellites in LEO to communicate with other LEO satellites and GEO satellite as part of the TDRS system
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Laser based Inter-Satellite Link (LEO-GEO) for Small LE | 2022-10-19 | HQIDS | it is proposed to develop a Laser based Optical Inter-Satellite Link payload for small satellites in LEO to communicate with other LEO satellites and GEO satellite as part of the TDRS system. The system with all its power electronics should be able to easily integrate into LEO satellites. The desired data rate for this system is greater than 1.5Gbps. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
This vehicle will remove large orbital debris from LEO by approaching debris, assess its characteristics and motion, determine an initial capture trajectory, match its rotation rates, execute a capture maneuver, and control and deorbit the object
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Orbital Transfer Vehicle for Space Debris removal in Lo | 2022-10-19 | HQIDS | This vehicle will remove large orbital debris from LEO by approaching debris, assess its characteristics and motion, determine an initial capture trajectory, match its rotation rates, execute a capture maneuver, and control and deorbit the object. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
Mini satellites are the game changers for future missions due to their quick developmental times and modular designs
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Mini Imaging and Communication Satellites for Launch on | 2022-10-19 | HQIDS | Mini satellites are the game changers for future missions due to their quick developmental times and modular designs. The LoD option would require compatible mini satellites for quick integration into the launch vehicle. Hence development of one mini communication and one mini imaging (EO/IR) satellite for integrating into the LoD launch vehicle is proposed as a challenge. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
Transportable launchers can be moved and deployed for launch from ground/ aerial/ sea-based platforms to provide launch capabilities with flexibility of launch windows for different kind of payloads
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Transportable/Mobile Launch Sys for Small Satellites (u | 2022-10-19 | HQIDS | Transportable launchers can be moved and deployed for launch from ground/ aerial/ sea-based platforms to provide launch capabilities with flexibility of launch windows for different kind of payloads |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
As a component of the Challenge 1, it is proposed to develop a mobile Multi Object Tracking Radar which can be deployed on any existing suitable military prime mover or develop a suitable one, for mobile operations
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Mobile Multi Object Tracking Radar with detection range | 2022-10-19 | HQIDS | As a component of the Challenge 1, it is proposed to develop a mobile Multi Object Tracking Radar which can be deployed on any existing suitable military prime mover or develop a suitable one, for mobile operations. This radar should have a detection range of min 250 km or more and should be able to track at least 15 objects (25 x 25 cms) simultaneously. All radar system accessories incl power system should also be integrated with the radar. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
LEO imaging satellites are visible to any single GES (Ground Earth Station) for a short period of time
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Geostationary Earth Orbit Data Relay Satellite with hig | 2022-10-19 | HQIDS | LEO imaging satellites are visible to any single GES (Ground Earth Station) for a short period of time. For rapidly increasing voluminous data download from sensors in space, necessitates more number of GES to enable complete data dump by the satellites before the next imaging session. However, the LEO satellites are visible to a GEO satellite for comparatively more amount of time and GEO satellite is constantly visible to GES. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
Satellites in LEO can move data 33 times faster than satellites in GEO
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Highly Agile (Agility rate > 7°/sec) Small Satellite Co | 2022-10-19 | HQIDS | Satellites in LEO can move data 33 times faster than satellites in GEO. This advantage has an application in future high-end conflict where speed of data transmission is very important. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
A SSTO vehicle reaches orbit from the surface of a body using only propellants and fluids and without expending tanks, engines, or other major hardware
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Modular Single-Stage-to-Orbit (SSTO) Launch Vehicle Sys | 2022-10-19 | HQIDS | A SSTO vehicle reaches orbit from the surface of a body using only propellants and fluids and without expending tanks, engines, or other major hardware. The term usually, but not exclusively, refers to reusable vehicles |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
TSTO is a launch vehicle in which two distinct stages provide propulsion consecutively in order to achieve orbital velocity
AIP Date : 2022-10-19
SHQ : HQIDS
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Modular Two-Stage-to-Orbit (TSTO) Launch Vehicle System | 2022-10-19 | HQIDS | TSTO is a launch vehicle in which two distinct stages provide propulsion consecutively in order to achieve orbital velocity. At liftoff the first stage is responsible for accelerating the vehicle and the second stage detaches from the first stage and continues to orbit under its own powe |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Col R Jitendra | NA | NA | 8437214433 | dirrnddsa.ids@gov.in |
Brief:
A single protable device for provision of end to end secure transmission of voice, data and fax on various communication media being used in the Army
AIP Date : 2006-04-11
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Terminal End Secrecy Device (TESD) | 2006-04-11 | Army | A single protable device for provision of end to end secure transmission of voice, data and fax on various communication media being used in the Army. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig SK Choudhary, DDG,Col Dheeraj Kumar,Lt Col Rohan Gupta | NA | NA | 33730,23019054,33733,33742 | NA |
Brief:
TCS shall provide voice, data and video cpapbility ot the filed forces in the TBA usig state on the art, robust and secure, statuic & mobile communication technology
AIP Date : 2009-04-10
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Tactical Communication System (TCS) | 2009-04-10 | Army | TCS shall provide voice, data and video cpapbility ot the filed forces in the TBA usig state on the art, robust and secure, statuic & mobile communication technology. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig SK Choudhary, DDG,Col Kang,Lt Col Mohit Wadhera | NA | NA | 33730,23019054,33743,33736 | NA |
Brief:
AFV-ILTs will act as a Force Multiplier and are envisaged to be employed either in conjuction with existing fleet of tanks or independently in varying terrain and operational conditions
AIP Date : 2022-03-02
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Indian Light Tank | 2022-03-02 | Army | AFV-ILTs will act as a Force Multiplier and are envisaged to be employed either in conjuction with existing fleet of tanks or independently in varying terrain and operational conditions. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2023-02-21 | NA | 2023-04-16 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig PK Kanwar, DDG,Lt Col Amit Rana | NA | NA | 33576,35093 | NA |
Brief:
There is a requirement of developing Ka Band terminals which can be utilised by high mobility/ velocity aerial platforms / weapon systems that creates highly time varying channel conditions degrading communications significantly
AIP Date : 2022-10-19
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Lightweight, Compact Ka band User Terminals for mobile | 2022-10-19 | Army | There is a requirement of developing Ka Band terminals which can be utilised by high mobility/ velocity aerial platforms / weapon systems that creates highly time varying channel conditions degrading communications significantly. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig SK Choudhary, DDG | NA | NA | 33730,23019054,23018984 | NA |
Brief:
FRCV will have superior mobility, all terrain agility, multi-layered protiection, precision lethal firepower, real time situational awarenesss duly integrating available niche technology and will offer multiple options for rapid oprational employment
AIP Date : 2023-04-27
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Future Ready Combat Vehicle- Armoured Fighting Vehicle | 2023-04-27 | Army | FRCV will have superior mobility, all terrain agility, multi-layered protiection, precision lethal firepower, real time situational awarenesss duly integrating available niche technology and will offer multiple options for rapid oprational employment. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Lt Col Amit Rana | NA | NA | 33569 | NA |
Brief:
A reconnaissance pods carried on aircraft for airborne surveillance and monitoring interacting with ground based system for transferring real time images
AIP Date : 2022-03-02
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Airborne Electro-Optical Pod with Ground Based System | 2022-03-02 | AF | A reconnaissance pods carried on aircraft for airborne surveillance and monitoring interacting with ground based system for transferring real time images. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr Navneet Dutta | 21117416 | Wg Cdr Proj (SDI) | 23060217 | Flanker.lgs@gov.in |
Brief:
ASOJ is envisaged to have electronic attack (EA) capability based on the ESM inputs recieved from various sources, on a transport class of platform to degrade/supress the enemy potenital and permit attackaircraft to pentrate the dence Air Defence Network of enemy
AIP Date : 2022-03-02
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Airborne Stand – Off Jammer | 2022-03-02 | AF | ASOJ is envisaged to have electronic attack (EA) capability based on the ESM inputs recieved from various sources, on a transport class of platform to degrade/supress the enemy potenital and permit attackaircraft to pentrate the dence Air Defence Network of enemy. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Wg Cdr Chetan Gosain | 21115703 | Wg Cdr Ops IEW | 23063727 | Mastergreen.space@gov.in |
Brief:
This equipment is replacement of foreign sourced networking devices along with associaed security related software with indigenous communication equipment with Indian security protocol system
AIP Date : 2022-03-02
SHQ : AF
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Communication System with Indian Security Protocols | 2022-03-02 | AF | This equipment is replacement of foreign sourced networking devices along with associaed security related software with indigenous communication equipment with Indian security protocol system. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
NA | NA | NA |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Gp Capt SM Choudhari | 21117518 | NA | 23011827 | kamakaya.14@gov.in |
Brief:
GBMRS is capablily of recording minefield with adequate accuracy and also should be able to indicate correct location of mines, even if they have drifted from their original locations
AIP Date : 2018-11-02
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Geographic Information Systems/ Global Positioning Syst | 2018-11-02 | Army | GBMRS is capablily of recording minefield with adequate accuracy and also should be able to indicate correct location of mines, even if they have drifted from their original locations. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2020-07-10 | NA | 2020-09-02 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Muthu Kumar, DDG Col Madhu Nair,Lt Col Lavan Kumar | NA | NA | 35778,23019359,35730,32106 | NA |
Brief:
RPAS/Drones have greatly impacted the modern battlefield Runway Independent concept affods greater operational flexibility in the category of RAPS
AIP Date : 2021-08-11
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Tactical Remotely Piloted Aircraft System (RPAS) Runway | 2021-08-11 | Army | RPAS/Drones have greatly impacted the modern battlefield Runway Independent concept affods greater operational flexibility in the category of RAPS. Ground based sensors have limited surveillance depth. There is a ned for aerial surveillance platform with a range of 80-100 kms for tactical surveillance, target acquisition. Direction of Own Arty Fire and post strike damage assessment (PSDA). (RWI-RPAS) are ideal for mobile operations reducing fixed wing launch and recovery chanllenges while freeing troops from stationary runway constraints. The availability of RWI-RPAS will enhance the operational capability by establishing a faster, shorter and responsive Secsor-Shooter Link. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2023-03-10 | NA | 2023-05-08 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Adarsh Verma, DDG Col Sanket | NA | NA | 33599,33598,33616 | NA |
Brief:
Autonomous Surveillance and Armed Drone Sward (HAA) consists of a set of 50/75 drones with AI based swarming featurs
AIP Date : 2021-08-11
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Autonomous - Surveillance and Armed Drone Swarm (HAA) | 2021-08-11 | Army | Autonomous Surveillance and Armed Drone Sward (HAA) consists of a set of 50/75 drones with AI based swarming featurs. Payload consists of day/night camera, HE Bomb and shaped charge top attack ammn. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2022-09-19 | NA | 2022-11-17 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig PK Kanwar, DDG Col Sumit Bhat | NA | NA | 33576,33564 | NA |
Brief:
Autonomous Surveillance and Armed Drone Sward (Desert/Plains) consists of a set of 50 drones with AI based swarming features
AIP Date : 2021-08-11
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Autonomous - Surveillance and Armed Drone Swarm (Desert | 2021-08-11 | Army | Autonomous Surveillance and Armed Drone Sward (Desert/Plains) consists of a set of 50 drones with AI based swarming features. Payload consists of day/night camera, HE Bomb and shaped charge top attack ammn. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2022-09-22 | NA | 2022-11-15 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig PK Kanwar, DDG Col Sumit Bhat | NA | NA | 33576,33564 | NA |
Brief:
125mm APFSDS is the primary tank ammunition utilised for destruction of enemy tanks
AIP Date : 2016-04-12
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
125mm APFSDS Amn higher DoP of 530mm | 2016-04-12 | Army | 125mm APFSDS is the primary tank ammunition utilised for destruction of enemy tanks. This ammunition with DoP of 460mm/530 mm is being fired from the Gun Barrel of Tank T-72/T-90. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2020-06-06 | NA | 2020-06-30 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig PK Kanwar, DDG Col Jai Singh | NA | NA | 33576,35094 | NA |
Brief:
MRPKS once launched can 'loiter' in the air and provide real time imagery to the operator on ground
AIP Date : 2018-02-19
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Medium Range Precision Kill System (MRPKS) | 2018-02-19 | Army | MRPKS once launched can 'loiter' in the air and provide real time imagery to the operator on ground. On detection of a suitable target, the munition with a warhead can be directed onto the target with precision. Current and future battlefield milieu necessitates the requirement or precision guided muhnitions in order to achieve first strike kill and psychological ascendance over the enemy. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2021-12-17 | NA | 2022-02-11 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Adarsh Verma, DDG Col Prashant Kumar | NA | NA | 33599,23018548,33617 | NA |
Brief:
SDR is a state of art radio with built in provn for interoperability with legacy sys with the ability to add, remove or modify the nw infra through re-config and re-dply waveforms leading to multi-mode, multi freq and multi-platform ops in a single hardware config
AIP Date : 2018-11-02
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
HF Manpack Software Defined Radio | 2018-11-02 | Army | SDR is a state of art radio with built in provn for interoperability with legacy sys with the ability to add, remove or modify the nw infra through re-config and re-dply waveforms leading to multi-mode, multi freq and multi-platform ops in a single hardware config. Replacement of RS HX PRC 6020. The HF Man-pack SDR will be dply in units and fmns of the IA to meet secure voice, video, messaging and data comn for beyond the Line of Sight (LoS) comn rgs. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2022-05-23 | 2022-07-18 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig SK Choudhary, DDG,Col Ashish Awadhi,Lt Col Harman Preet | NA | NA | 33730,23019054,33681,33684 | NA |
Brief:
Contemporary Combat Vehicles have on board protective cum warning systems to warn the crews of impending attacks and create a physical interference between the platform and hostile threat thereby enhancing its survivability
AIP Date : 2019-09-27
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Armoured fighting Vehicle (AFV) Protection aned Counter | 2019-09-27 | Army | Contemporary Combat Vehicles have on board protective cum warning systems to warn the crews of impending attacks and create a physical interference between the platform and hostile threat thereby enhancing its survivability. The existing fleet of combat vehicles in service with the Indian Army does not offer the crew these enhanced protection measues. Therefore, there was a reqmt of Active Protection System for tk T90 to chance its survivability. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2021-04-09 | NA | 2021-07-04 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig PK Kanwar, DDG Lt Col Amit Rana | NA | NA | 33576,34239 | NA |
Brief:
Auxiliary Power Unit is an alternate source of power for the fire control system of the tank and ancillaies, to cater for power reqmts during a lull in a battle while deployed in surveillance mode and during training, with a view to conserve the life of main engine of the tank in all terrain including HAA and enhance its combat potential and endurance
AIP Date : 2019-09-27
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Auxiliary Power Unit (APU) for T-90 Tank | 2019-09-27 | Army | Auxiliary Power Unit is an alternate source of power for the fire control system of the tank and ancillaies, to cater for power reqmts during a lull in a battle while deployed in surveillance mode and during training, with a view to conserve the life of main engine of the tank in all terrain including HAA and enhance its combat potential and endurance. Therefore, APU was progressed under Make II category for T-90 S/SK. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2020-01-27 | NA | 2020-06-15 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
NA | NA | NA | NA | NA |
Brief:
A solution for providing Digital Voice, Video, Messaging and Data connectivity at the Formation, Unit and Subunit level, right up to the forward edge of the Tactical Battle Area(TBA)
AIP Date : 2019-02-06
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
V/UHF (Very/Ultra High Frequancy) Manpack Software Defi | 2019-02-06 | Army | A solution for providing Digital Voice, Video, Messaging and Data connectivity at the Formation, Unit and Subunit level, right up to the forward edge of the Tactical Battle Area(TBA). |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2020-06-23 | NA | 2020-08-18 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Rajiv Singh, DDG Col Sunil Sharma,Lt Col Harman Preet,Col Aashish | NA | NA | 33730,23019054,33681,33684,33685 | NA |
Brief:
Envisaged for providing early warning to AD weapons deployed in mountains and High Altitude Area (HAA) and the weapon mounted platforms operating in deserts
AIP Date : 2019-09-27
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Low Level Light Weight Radar | 2019-09-27 | Army | Envisaged for providing early warning to AD weapons deployed in mountains and High Altitude Area (HAA) and the weapon mounted platforms operating in deserts. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2023-01-16 | NA | 2023-05-26 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Videsh Mahagan,Col A Mishra,Lt Col Avneesh Payal | NA | NA | 33637,23015616,33632,33643 | NA |
Brief:
A capability enhancement to Land Based Air Defence Weapon Systems such as IGLA shoulder fired IR Homing AD Missile System and ZU 23mm 2B AD Gun System by providing the operator with radar and thermal imaging sight outputs as overlays on the real life view of surroundings
AIP Date : 2021-08-11
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Augmented reality (AR) based head Mounted display syste | 2021-08-11 | Army | A capability enhancement to Land Based Air Defence Weapon Systems such as IGLA shoulder fired IR Homing AD Missile System and ZU 23mm 2B AD Gun System by providing the operator with radar and thermal imaging sight outputs as overlays on the real life view of surroundings |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2020-08-17 | NA | 2020-10-12 |
Name | Fax | Designation | Phone | |
---|---|---|---|---|
Brig Videsh Mahajan,Col Vikram Devgan | NA | NA | 33637,23015616,34884 | NA |
Brief:
will include modified replica of L-70-gun model to cater for the specific training of Gun crews to provide realistic feel to the gunners
AIP Date : 2018-09-17
SHQ : Army
Project Name | AIP Date | SHQ | Brief |
---|---|---|---|
Integrated Air Defence Combat Simulator | 2018-09-17 | Army | will include modified replica of L-70-gun model to cater for the specific training of Gun crews to provide realistic feel to the gunners. |
Start Date | Questionnaire Document | End Date |
---|---|---|
NA | NA | NA |
EOI Document | Start Date | End Date |
---|---|---|
2021-08-24 | 2021-10-19 |
Name | Fax | Designation | Phone |
---|