MAKE Projects

MAKE Procedure was first promulgated in Defence Procurement Procedure (DPP-2006). The procedure was simplified/ streamlined in 2016, 2018 and 2020 with a perspective of fostering indigenous capabilities through design and development of required defence equipments/ products/ systems or upgrades/ sub-systems/ components/ parts by both public and private sector industry/ organization in a faster time frame.

What's New New_gif

  • Expression of Interest(EoI) uploaded for Integrated Stand-By Instrument System(ISIS) with the last date of submission as 17th Oct 2024.
  • Questionnaire for Development of Highly Agile (Agility Rate > 7 deg/sec) Small Satellite Constellation (2 Satellites) for LEO issued on 09 Dec 2024 with last date as 31 Dec 2024
  • Questionnaire for Development of a GEO Tracking and Data Relay Satellite (TDRS) having high speed optical ISL Link capable of communicating with LEO Satellites issued on 09 Dec 2024 with last date as 31 Dec 2024
  • Questionnaire for DEVELOPMENT OF ORBITAL TRANSFER VEHICLE FOR SPACE DEBRIS REMOVAL IN LEO uploaded on 9 Dec 2024 with last date as 31 Dec 2024

MAKE-I (Government Funded)

Funding upto 70% of prototype development cost
or maximum Rs. 250 crores per Development Agency,
Indigenous Content (IC): Min 50%.

MAKE-II (Industry Funded)

Primarily for import substitution,
No Government funding, IC : Min 50%

MAKE-III (Manufactured in India through ToT from FOEMs)

No design & development but manufacturing in
the country with Min IC of 60%.